Category: Empennage

Construction Start

HS-908 attach angle rough cut

I officially started construction of my RV-9A on July 17, 2012. The first major sub-assembly to be made is the horizontal stabilizer. Construction began with fabrication of the two HS-908 Attach Angles. The instructions indicate that these and the two HS-909 shims are the only items that need to be made from scratch so I …

Continue reading